Also I have been speaking with a friend of mine who has some experience of TIG welding and he has agreed to have a go at making up the battery boxes from a couple of 8 x 4 sheets of 3mm thick aluminum that I have had kicking around for years, we should be able to cut out all the Battery Box parts and clean them up a bit ready for welding , I am also going to get a box made up for the charger (which I am still building) from the same sheets of aluminum.
So all in all things are starting to move in the right direction, I hope that the car will be back with me (motor & gearbox fitted) by the end of this week (optimistic in my opinion) so that I can get Steve (my EV specialist) to have a looksee at where we are going to put the rest of the bits (Charger/Battery boxes/Soliton Jr etc).
Exiting times!
No comments:
Post a Comment